This guide is for event managers, coordinators and anyone running an event day. It explains what a run sheet is, what columns to include, how to write cues and buffers, and how to share it, with sample run sheets you can adapt.
- The run sheet is the team's master script
- Every line needs a time, owner and cue
- Add buffers before VIP moments
- Share one master version only
- Brief the crew before doors open

Columns to include
- Time and duration
- Segment (registration, welcome, keynote and so on)
- Details and cues (music, lights, LED, microphone)
- Owner
- Dependency (what must happen first)
Run sheet vs programme vs call sheet
- Programme: what guests see, a simple running order
- Run sheet: what the team uses, every minute with cues and owners
- Call sheet: supplier and crew arrival times and contacts
All three must match. When the programme changes, update the run sheet and call sheet straight away.
Writing cues clearly
A cue tells someone exactly what to do and when: "18:58: Stage manager calls house lights to 30%. AV plays walk-in loop. MC on standby stage left." Write cues as short, active instructions. Number them so the stage manager can call "Cue 14, go." Mark any cue that depends on another, for example video playback after the MC's line.
Sample run sheet
| Time | Segment | Cue | Owner |
|---|---|---|---|
| 14:00 | Supplier load-in | AV and staging access | Event manager |
| 16:30 | Technical rehearsal | LED, mics, walk-ups | Stage manager |
| 18:00 | Registration opens | Welcome music | Registration lead |
| 18:45 | Guests seated | House lights down | Ushers |
| 19:00 | Welcome and lamp lighting | MC script p.1 | MC and protocol |
| 19:15 | Keynote | Lectern mic, slides 1–20 | AV |
Tips
- Add buffers before VIP segments
- Print copies and share digitally
- Brief every owner in a pre-event huddle
Run sheets are part of our event management Sri Lanka service and our event planning process. Speak to our event management company in Sri Lanka.
Building in buffers
Real events rarely run exactly to time. Add five to ten minutes of buffer before critical segments such as the chief guest's arrival, a keynote or a live link. Identify flexible segments (entertainment, networking) that can shrink or stretch, and fixed segments that can't move. The stage manager uses these to keep the event on schedule.
Sharing the run sheet
Share one master version, labelled with a version number and time, with everyone who needs it: event team, stage manager, AV, venue coordinator, MC, catering lead and key suppliers. Print copies for the stage, AV desk and registration, and keep a digital copy on phones. Hold a 15-minute crew briefing before doors open to walk through it.
Common run sheet mistakes
- Missing setup and pack-down times
- No owner for each line
- Vague cues such as "start video"
- No buffers before VIP segments
- Several versions in circulation
- Missing emergency contacts
- No plan for when a speaker overruns
Run sheet template fields to copy
Copy these columns into a spreadsheet: Cue #, Time, Duration, Segment, Location, Description, Audio, Lighting, LED/Video, Owner, Dependency, Notes. Add a header with the event name, date, venue, version, event manager contact and emergency contacts. Our event management Sri Lanka team writes and runs this for every event, as part of event planning.
Sample run sheet header
Every run sheet should open with a header block: event name, date, venue and hall, version number and time stamp, event manager name and mobile, stage manager name and mobile, venue coordinator contact, AV lead contact, first-aider, nearest hospital, and the Wi-Fi details for the crew. Keeping this on page one means anyone can find critical contacts in seconds.
Run sheet example for a seminar
Here is a short example for a two-hour morning seminar. 07:00: venue access, AV and staging load-in. 08:00: sound check, slides loaded and tested, registration desk set. 08:30: crew briefing. 08:45: registration opens with walk-in music. 09:15: guests seated, house lights down, MC welcome. 09:20: lamp lighting with the chief guest and anthem. 09:30: keynote, with lectern mic and slides 1–25. 10:00: panel discussion, four handheld mics, panel chairs set. 10:40: audience Q&A with two roving mics. 10:55: vote of thanks. 11:00: tea and networking, photographer covering. 11:45: pack-down. Every line also lists its owner and dependency in the full sheet.
Even a simple event like this has more than 30 cues once you include lighting, music and slides. That's why a written run sheet matters. Our event management Sri Lanka team prepares one for every event.
Example scenario
At an award night, cue 23 reads: '20:14, LED plays winner graphic, walk-up sting, spotlight on table 6, MC reads citation.' The stage manager calls each cue over radio. When the chief guest arrives 12 minutes late, the stage manager uses the buffer and moves the first entertainment segment forward, so nobody in the audience notices the change. Because the run sheet lists owners and dependencies, every crew member knows exactly what changed.
This is an illustrative scenario, not a specific client case.
Tips from our event team
- Print in large font for the stage
- Number every cue
- Highlight fixed and flexible segments
- Include emergency contacts in the header
- Version-stamp every update
Quick checklist
- Header with contacts
- Numbered cues
- Owners on every line
- Buffers before VIP segments
- One master version
- Crew briefing scheduled
How Cypher Events can help
Cypher Events delivers full event management across Sri Lanka. We contract and brief every supplier, manage stage, sound, lighting and LED production, write and run the run sheet, staff registration and ushering, handle chief guest and VIP protocol, and run a technical rehearsal before guests arrive. On the day, a named event manager and stage manager lead a crew that keeps every cue on time, with contingency plans for weather, power and supplier issues.
Because we're part of the same group as Cypher Digital and Findit.lk, your event can also be promoted and turned into content: teaser reels, Facebook, Google, PR, SMS, WhatsApp and banner campaigns, live posting on the day and highlight videos afterwards.
See event management Sri Lanka, plan ahead with event planning Sri Lanka, or speak to our event management company in Sri Lanka on +94 76 031 7477.
Key terms in this guide
- run sheet
- The minute-by-minute schedule for event day, listing every segment, cue, owner and dependency.
- call sheet
- A list of every supplier and crew member with arrival times, setup areas and contact numbers.
- chief guest
- The senior guest of honour at a Sri Lankan event, who usually lights the lamp and gives an address.
- lamp lighting
- The traditional oil-lamp lighting ceremony that opens many formal events in Sri Lanka.
- technical rehearsal
- A full run-through of sound, lighting, video and cues before guests arrive.
- stage manager
- The crew member who calls cues from the run sheet and keeps the programme on time.
Frequently asked questions
What is a run sheet in event management?
A detailed, timed schedule of everything that happens on event day, with owners and cues.
Who should get the run sheet?
The event team, stage manager, AV, venue coordinator, MC and key suppliers.
How detailed should a run sheet be?
Detailed enough that anyone could pick it up and run the event.
How early should the run sheet be finished?
Draft two weeks out and lock it 48 hours before the event.
Who calls the cues?
The stage manager, working from the run sheet.
Should the MC have the run sheet?
The MC needs the script and programme. The full run sheet helps them understand timing.
What if the chief guest is late?
Use the buffers and move a flexible segment forward.
Can I use the run sheet template for small events?
Yes. Simplify the columns, but keep times and owners.
Does Cypher Events provide a run sheet?
Yes. Every event we manage runs from a detailed run sheet.
What goes in a run sheet header?
Event details, version, key contacts, the first-aider and emergency information.
What is the difference between a run sheet and a timeline?
A timeline covers planning milestones over weeks. A run sheet covers event day minute by minute.
Who updates the run sheet on the day?
The event manager or stage manager, who communicates changes to the crew.
What software can I use for a run sheet?
A shared spreadsheet works well for most events.
How many people need the run sheet?
Everyone with a role in the programme.
Should the run sheet include setup?
Yes, from supplier load-in to pack-down.
What is a cue in event management?
An instruction to do something at a specific moment, such as starting a video.



